Color Kinetics Installation Checklist

Instructions for Completion. This was created to help minimize installation errors when installing Color Kinetics products. It is not an all-inclusive guide. Please review Installation Instructions a…


Instructions for Completion

  • This was created to help minimize installation errors when installing Color Kinetics products. It is not an all-inclusive guide. Please review Installation Instructions and Specifications to ensure proper installation. Download Installation Checklist in .docx format. (if nothing happens, right-click and choose Open link in new tab to download).
  • This checklist does not need to be returned to Signify upon completion.
  • For bolded items below, please reference the Installation Requirements articles on the Color Kinetics Website.
  • For questions or support regarding this checklist, please contact your Signify Color Kinetics representative.

Project Name:



Project Address
(if address unavailable, please input site coordinates):



Pre-Installation Design

Task/Action.......................................................

Completion Date and Details.............................

1. Assess environment and specific

installation location to confirm

suitable products are selected for

site temperatures and

environmental conditions.


What is the maximum expected

temperature to which products will be exposed?

2. Is product properly selected for

site conditions/is installation near

coastline (<3 miles) or in an otherwise

corrosive area?


What is the distance to the nearest coastline?

3. Assess installation for Ingress

Protection requirements. Refer to

IP66 Knowledge document for an

overview of the IP66 rating.

4. Assess vibration environment and

confirm suitable products are selected.

5. Check www.colorkinetics.com for any

application notes.

6. Locate, read, and understand

Installation Instructions at

www.colorkinetics.com for each product

being installed.

7. Evaluate fixture run lengths using

the applicable Configuration Calculator.

If input is needed, contact Color Kinetics

for support.


What is the longest run length of

fixtures on this project?

8. Ensure site wiring plan does not

contradict installation instructions.

9. Assess electrical surge protection

and lightning protection requirements

referencing the Surge Knowledge document.



Installation

Tasks/Action.......................................................

Completion Date and Details.............................

1. Follow and adhere to Installation

Instructions for all products being installed.

2. Read and follow all safety warnings in the

product Installation Instructions.

3. Keep end connectors free from dirt or

contamination while stored awaiting

installation. If product is being stored for

extended periods of time, review the

Long-Term Storage Guidance document.

4. Check www.colorkinetics.com for any

firmware updates.

5. Follow all pertinent Electrical Codes

during install.

6. Do not use temporary generators to

power fixtures.

7. Assess cable layout to comply with

bend radius guidance in Installation

Instructions. Do not over bend cables.

8. Fully latch all connectors per

Installation Instructions. Attach end

terminator to last fixture if required.

Do not allow unmated connectors to

be exposed to water.

9. Install proper Surge Protection

Devices. Contact a qualified professional for guidance.


List surge protection devices

(including lightning protection

systems). Describe the surge

protection installation method on

this project.

10. Properly seal all junction boxes and

Power Data Supplies per Installation

Instructions.


What kind/type of junction boxes are

installed and what sealing methods

have been used?

11. Attach appropriate safety cable

tether per Installation Instructions for

raised fixtures.


What is the maximum height fixtures

are installed? Please list what is directly

below fixtures.

How Did We Do?

Long-Term Storage Guidance for Color Kinetics Fixtures, Controls, and Accessories

Contact